Toppilansalmi blocks 78 and 79
Preliminary deign of Toppilansalmi blocks 78 and 79 for the basis of the master plan.
planning, project and architect design
50 000 m²
2010
2011 Archeus Ltd. is designing the first buildings to the area, Co-op Oulun Priki and the re-use of the old grain silo and mill.
The SOK mill site was designed for conversion for a living area, by both re-using the existing mill, silos and warehouses as well as inserting new
buildings.
buildings.
Built in the first half of the 20th century, the silos and mill will be renovated into apartments and offices. The silo will house twelve floors of
apartments, including loft apartments on two floors.
apartments, including loft apartments on two floors.
An important guiding principle in the design has been to make new openings that fill the requirements for daylight, but still retain as much of the
round look of the silos as possible.
round look of the silos as possible.